Curious about the status of Project One? Watch this video with up-to-date images and interesting figures surrounding the project.
These other videos might interest you
-
ECR-1 unit arrived at Project ONE
The first ECR module arrived at the Project ONE site in the port of Antwerp in the first major waterborne transport.
-
How do you put the roof on a 900 tonne tank? With air pressure!
At Project ONE, the ethane tank roof was installed in a unique way: using - amazingly little - air pressure, the steel structure was ‘blown’ upwards.
-
Project ONE Podcast
Listen to our unique podcast about Project ONE, which zooms in and out of the project simultaneously and continues where media coverage stops.